top of page

SCREENING INSTALLATION AT HERB GROWER IN NORTH YORKSHIRE

  • Tony Walker
  • Apr 11
  • 1 min read

Ebtech Glasshouse Systems Ltd have completed the thermal screening installation at a local herb growing Nursery in North Yorkshire.


Having previously built the glasshouse, we returned to supply & install the screening


Covering an area measuring 4,032m², (57.60m wide x 70.00m long), using a horizontal roof cloth from the Svensson range, Harmony 7247 FR material, this provided a 73% diffused light shading and a 47% energy saving 


The Harmony cloth is a white screen material and in this application is a closed weave to retain the energy. The white strips providing a higher grade of light diffusion.


On the side and gable walls we installed a fixed cloth, type Harmony 7445 R FR, which gives a shade offering of 75% diffused light and 45% energy saving.


The operating mechanism was a 19mm leading edge, working on a wire driven system, operated via a Ridder RW1600 drive unit.


The installation was completed in under two weeks, working off stilts to the complete satisfaction of our client. 



















Comentarios


Contact Us

Ebtech Glasshouse Systems Ltd

Beckside Granary, Mill Farm, 

Common Road, South Cave

East Yorkshire

HU15 2EA

01964 621726

  • Facebook
  • LinkedIn
CHAS image.jpg
2023-Ebtech-logo-CMYK.png
GLASSHOUSE SYSTEMS

© Ebtech Glasshouse Systems Ltd 2025

steering_wheel.png

Website design by Cat Lund

bottom of page